Kinetic Gain · Operator Surface
Site · permits.kineticgain.com
Lane · Construction Tech
Mode · Permit-safe jobsite operations
Permit readiness Submittal governance Inspection parity Operator escalation

Permit package and inspection-ready control plane.

Permit queues, submission blockers, and inspection posture in one operator surface for construction and field teams that need cleaner jurisdiction handoffs before schedule risk spills into the site.

Inspection posture

Packet confidence and reviewer timing
57%
IP-11

Boston intake counter

Hold submission until the architect upload packet and revision register reconcile.

  • Status: red
  • Blocker: Stamped egress revision set still incomplete
  • Review window: 14 hours
red
66%
IP-12

Phoenix civil reviewer

Stage the resubmittal packet, but do not promise a clean intake until the utility memo is attached.

  • Status: yellow
  • Blocker: Utility sign-off evidence incomplete
  • Review window: 22 hours
yellow
81%
IP-13

Seattle field inspection crew

Inspection readiness is recoverable if the field packet is reissued before tomorrow's coordination call.

  • Status: yellow
  • Blocker: Energy worksheet revision pending packet sync
  • Review window: 28 hours
yellow
93%
IP-14

Austin final-review desk

The package stays healthy as long as the final memo and exhibit index remain bundled.

  • Status: green
  • Blocker: Owner sign-off queued
  • Review window: 72 hours
green