Permit queues, submission blockers, and inspection posture in one operator surface for construction and field teams that need cleaner jurisdiction handoffs before schedule risk spills into the site.
| Package | Owner | Risk | Next move |
|---|---|---|---|
| Harbor Point Mixed Use · Core + shell revision PRM-401 · Boston ISD Stamped structural sheets are present, but the revised egress note set is still missing from the upload package scheduled for tomorrow morning. |
Permitting manager | red | Lock the architect revision set and reassemble the AHJ-ready upload packet before 9 AM. |
| Mesa Logistics Hub · Civil site package PRM-402 · Phoenix Planning Utility coordination comments were accepted verbally, but the as-noted water service response is not yet attached to the submittal binder. |
Civil coordinator | red | Attach utility sign-off and update the resubmittal matrix before the next jurisdiction intake window. |
| Riverline Apartments · Tenant improvement PRM-403 · Seattle SDCI Energy worksheet values changed after the MEP update and the inspection packet still reflects the earlier load assumptions. |
MEP PM | yellow | Reconcile the worksheet and issue the corrected inspection-facing packet to field ops. |
| Summit Medical Office · Fire review response PRM-404 · Austin Development Services Fire marshal comments are mostly resolved, but the smoke-control narrative still needs owner sign-off before the final response memo is safe to send. |
Life-safety lead | yellow | Secure owner sign-off and issue the final response memo with the drawing index attached. |